Flexible Riser Inspection

The Scope of Work

Complete an assessment of the current and future integrity status of two subsea producing fields including pipelines, flowlines and manifolds.

Develop a life extension methodology based on industry best practice and the operator’s own requirements for field life. This was then consistently applied across all assets to enable a strategy to be developed.

The Challenges

Both subsea fields were complex and there were hundreds of previous reports and documents to consider as well as various levels of inspection data. One of the main challenges was presenting the data in a format that would provide the most benefit.

The Deliverable

A thorough life assessment was successfully completed providing clarity on assets and areas that were a risk to field life extension along with strategies to manage the risks. The work was not only delivered in a report but also our unique interactive schematic providing rapid access to the results.