Subsea Facilities Shaping Plan and 3-Year integrity strategy

The Scope of Work

Perform a prioritised gap analysis of the operator’s current integrity management practice and devise risk based shaping plan for the implementation of a new integrity management system that could be effectively communicated to all levels of the organization.

The Challenges

Origin has developed a clear methodology for performing management system gap analysis based on our extensive operational experience of their implementation. The challenge here was presenting the work in a clear and concise format.

The Deliverable

We developed a new graphical method based on our integrity icons to present the shaping plan in way that has not been seen before that is both visually impressive and technically concise. On the back of this annual objectives can be easily extracted and these have been turned into an integrated subsea integrity and operations plan within the Primavera P6 planning software.

Copyright © Origin Integrity Management Ltd 2019